Case Studies
Offices
Footfall-induced office vibration problem
A new long-span steel–concrete composite office floor, with unusually large 16 m × 12 m open-plan bays, exhibited vibration issues under normal walking ...
Gyms
Gym-induced vibration problem
An existing 380m² suspended office floor was rapidly converted into a gym within a multi-storey building in the centre of London.
Offices
Fast-track problematic vibration solution
F1 Arcade provides a hugely popular and very dynamic social gaming experience with simulators that replicate the thrills of a race through use of an ...
Healthcare
New hospital: a Net Zero carbon perspective
A new hospital that was to be built in south-west England was the subject of a robust Net Zero agenda set by the project’s designers and investors. The ...
Laboratories
Vibration control in a repurposed building
Following the recent refurbishment of an existing building, our customer’s building floors were repurposed from office space to a life science laboratory, ...
Offices
Human-induced floor vibration problems
An existing office floor set within a multi-use commercial building in London, UK, that served as an office environment had experienced human-induced floor ...